$ 150,000 a year

$ 150,000 a year

Reduction of Assembly
Line Stops

150 MIL DÓLARES POR ANO

The number of assembly lines stoppages per year was very high, the APS (Advanced Planning Simulation) was used to schedule the production, but it was
not connected in real time with the plant, resulting in a non-consistent production planning generating multiple changes every day due to missing items.


The M.O.M. system, which connects the machines with the tool shop and logistics, has created a real time information flow, now planning the production is based
in the most updated information, the assembly lines downtime dropped dramatically. Annual Savings are approximately US$ 150,000.